RKRizwan Khan
← Back to all projects

MG IT Services · Messaging & Collaboration · September 2011 — October 2011

MG IT ServicesExchange Consultant

I resolved open Exchange escalations and prepared the migration from Exchange 2007 to 2010.

Organisation
MG IT Services
Period
September 2011 — October 2011
Role
Exchange Consultant
Focus
Messaging & Collaboration
MG IT Services: Abstract infrastructure illustration for the MG IT Services engagement

Situation

Unresolved support cases were weighing on messaging operations while the move from Exchange 2007 to Exchange 2010 also had to be prepared.

Constraints

  • Changes within an already established IT environment
  • Short, clearly scoped engagement
  • Internal system and operating details remain confidential

My scope of responsibility

I took on 3rd-level tickets, analysed technical root causes and supported planning, guidance and knowledge transfer for the migration.

  • I analysed and resolved open Exchange support cases at 3rd level.

Documented scope of work

Key decisions

Systematically clear open operational issues before and during migration preparation. Unresolved legacy issues can reappear in the target environment or distort the assessment of migration errors.

  1. I planned the move from Exchange 2007 to Exchange 2010.
  2. I wrote guides and passed the required migration knowledge on to the support team.

Technology in use

Exchange 2007

Exchange 2007 was part of the documented toolset in this Messaging & Collaboration engagement.

Exchange 2010

Exchange 2010 was part of the documented toolset in this Messaging & Collaboration engagement.

3rd-Level Support

3rd-Level Support was part of the documented toolset in this Messaging & Collaboration engagement.

Migration

Migration was part of the documented toolset in this Messaging & Collaboration engagement.

Evidence and limits

Operational support and migration preparation were brought together on a cleaned-up, traceable technical basis.

Role
Exchange Consultant
Period
September 2011 — October 2011

Lesson from the engagement

A messaging migration benefits from making known legacy issues transparent and closing them deliberately before the version change.

Confidentiality note: Internal architecture and operating data of this engagement are not published.

Related case studies

Planning a demanding change to your Microsoft infrastructure?

View Enterprise Operations as a service Discuss your project