RKRizwan Khan
← Back to all projects

Bassler AG · Endpoint Management · January 2012 — February 2012

Bassler AGSCCM Consultant

I analysed OSD errors, developed tested images and packages and coordinated the technical work packages.

Organisation
Bassler AG
Period
January 2012 — February 2012
Role
SCCM Consultant
Focus
Endpoint Management
Bassler AG: Abstract infrastructure illustration for the Bassler AG engagement

Situation

Driver, configuration and network issues impaired operating system deployment and made a controlled rollout across multiple systems harder.

Constraints

  • Changes within an already established IT environment
  • Short, clearly scoped engagement
  • Internal system and operating details remain confidential

My scope of responsibility

I analysed OSD errors, created images, packages and templates, coordinated the internal team and structured testing and quality control.

  • I analysed driver, network and configuration errors in operating system deployment.
  • I coordinated tasks, implementation and quality control with the internal team.

Documented scope of work

Key decisions

Isolate deployment errors by technical layer and secure package quality before the rollout. Driver, network and configuration problems need different diagnostic paths; a shared quality gate prevents them from getting mixed up in the rollout.

  1. I created and tested OS images, packages and templates.

Technology in use

SCCM

SCCM was part of the documented toolset in this Endpoint Management engagement.

Operating System Deployment

Operating System Deployment was part of the documented toolset in this Endpoint Management engagement.

Driver Management

Driver Management was part of the documented toolset in this Endpoint Management engagement.

Task Sequences

Task Sequences was part of the documented toolset in this Endpoint Management engagement.

Evidence and limits

Operating system deployment gained a more structured technical and organisational rollout foundation.

Role
SCCM Consultant
Period
January 2012 — February 2012

Lesson from the engagement

OS deployment becomes stable when diagnosis, package quality and team coordination are run as one shared delivery process.

Confidentiality note: Internal architecture and operating data of this engagement are not published.

Related case studies

Planning a demanding change to your Microsoft infrastructure?

View MECM/SCCM & Windows 11 as a service Discuss your project